Production

Assembly

Assembly

With its assembly lines operating based on the principles of efficiency and flexibility, Atasan has two separate sections that operate with or semi automation.

Let’s engineer the right hinge for your project

Share your door weight, opening angle and life-cycle targets; our engineering team will prepare a solution tailored to you.

  1. 01Needs analysis
  2. 02Solid model · 1–3 weeks
  3. 03First prototype · 2–3 weeks